
Turbine 3, Caton Moor Wind Farm, near Lancaster, Lancashire, UK, 7 June, 2008
Still clean and er, off-white (which can dramatically decrease their visibility against a cloudy skyline), the REpower turbines will have been operating for two years next month. |